Description
The majority of mechanical equipment found in oil & gas, petrochemical and industry facilities belongs to the static equipment, which comprises pressure vessels (drums, columns, reactors, filters) and heat exchangers (shell and tubes, plate and frame, air coolers). The specification and selection of the equipment is the responsibility of the static equipment engineering, based on requirements specified by other disciplines, including process, materials and plant layout.
DAY 1 | DAY 2 | ||
08.00 – 08.30 | Registration and Prepare | 08.00 – 08.30 | Registration and Prepare |
08.30 – 10.00 | Tank Mixing | 08.30 – 10.00 | Atmospheric Storage Tank |
10.00 – 10.15 | Refreshment and Networking | 10.00 – 10.15 | Refreshment and Networking |
10.15 – 11.30 | Tank Mixing | 10.15 – 11.30 | Atmospheric Storage Tank |
11.30 – 12.30 | Lunch and Pray | 11.30 – 12.30 | Lunch and Pray |
12.30 – 14.00 | Tower | 12.30 – 14.00 | High Pressure Storage Tank |
14.00 – 15.30 | Tower | 14.00 – 15.30 | High Pressure Storage Tank |
15.30 – 15.45 | Refreshment and Networking | 15.30 – 15.45 | Refreshment and Networking |
15.45 – 17.00 | Drum | 15.45 – 17.00 | Refrigerated Storage Tank |
DAY 3 | |||
08.00 – 08.30 | Registration and Prepare | 11.30 – 12.30 | Lunch and Pray |
08.30 – 10.00 | Agitated Vessel | 12.30 – 14.00 | Inline Mixing |
10.00 – 10.15 | Refreshment and Networking | 14.00 – 15.30 | Inline Mixing |
10.15 – 11.30 | Agitated Vessel | 15.30 – 15.45 | Refreshment and Networking |
11.30 – 12.30 | Lunch and Pray | 15.45 – 17.00 | Vacuum Equipment |
Reviews
There are no reviews yet.