Power Generation and Substation System is to include establishment of the system and preparation of the equipment layout/installation with details. Single line diagram is to indicate power distribution system including necessary information for the electrical equipment, protection and monitoring to be employed in the power generation, power receiving and distribution system. Single line diagram is also utilized as supplementary drawing to the specification for equipment fabrication.
DAY 1 | DAY 3 | ||
08.00 – 08.30 | Registration and Prepare | 08.00 – 08.30 | Registration and Prepare |
08.30 – 10.00 | Equipment Layout in Substation | 08.30 – 10.00 | DC Power Supply System Specification |
10.00 – 10.15 | Refreshment and Networking | 10.00 – 10.15 | Refreshment and Networking |
10.15 – 11.30 | One Line Diagram and Power System | 10.15 – 11.30 | Neutral Earthing Resistor |
11.30 – 12.30 | Lunch and Pray | 11.30 – 12.30 | Lunch and Pray |
12.30 – 14.00 | Motor Specification and Data Sheet | 12.30 – 14.00 | Electrical Load Data Calculation |
14.00 – 15.30 | Generator Capacity and Specification | 14.00 – 15.30 | Short Circuit Calculation |
15.30 – 15.45 | Refreshment and Networking | 15.30 – 15.45 | Refreshment and Networking |
15.45 – 17.00 | Power Transformer Calc., Spec. & DS | 15.45 – 17.00 | Motor Start. Study & Load Shedding Study |
DAY 2 | DAY 4 | ||
08.00 – 08.30 | Registration and Prepare | 08.00 – 08.30 | Registration and Prepare |
08.30 – 10.00 | Power Capacitor Calc., Spec. & DS | 08.30 – 10.00 | Protective Relay Coordination Study |
10.00 – 10.15 | Refreshment and Networking | 10.00 – 10.15 | Refreshment and Networking |
10.15 – 11.30 | Switchgear Specification & Data Sheet | 10.15 – 11.30 | Voltage Drop and Load Flow Study |
11.30 – 12.30 | Lunch and Pray | 11.30 – 12.30 | Lunch and Pray |
12.30 – 14.00 | Motor Control Center Spec. & Data S. | 12.30 – 14.00 | Announciator Panel |
14.00 – 15.30 | Distribution Board Spec. & Data Sheet | 14.00 – 15.30 | Bus Duct Calculation and Specification |
15.30 – 15.45 | Refreshment and Networking | 15.30 – 15.45 | Refreshment and Networking |
15.45 – 17.00 | UPS Capacity and Specification | 15.45 – 17.00 | Electrical Interface to DCS |