POWER GENERATION & SUBSTATION DESIGN

Rp 11.500.000

Power Generation and Substation System is to include establishment of the system and preparation of the equipment layout/installation with details.

SKU: PB-12 KET-A381 Category: Tags: ,

Description

Power Generation and Substation System is to include establishment of the system and preparation of the equipment layout/installation with details. Single line diagram is to indicate power distribution system including necessary information for the electrical equipment, protection and monitoring to be employed in the power generation, power receiving and distribution system. Single line diagram is also utilized as supplementary drawing to the specification for equipment fabrication.

DAY 1   DAY 3  
08.00 – 08.30 Registration and Prepare  08.00 – 08.30 Registration and Prepare
08.30 – 10.00 Equipment Layout in Substation  08.30 – 10.00 DC Power Supply System Specification
10.00 – 10.15 Refreshment and Networking  10.00 – 10.15 Refreshment and Networking
10.15 – 11.30 One Line Diagram and Power System  10.15 – 11.30 Neutral Earthing Resistor
11.30 – 12.30 Lunch and Pray  11.30 – 12.30 Lunch and Pray
12.30 – 14.00 Motor Specification and Data Sheet  12.30 – 14.00 Electrical Load Data Calculation
14.00 – 15.30 Generator Capacity and Specification  14.00 – 15.30 Short Circuit Calculation
15.30 – 15.45 Refreshment and Networking  15.30 – 15.45 Refreshment and Networking
15.45 – 17.00 Power Transformer Calc., Spec. & DS  15.45 – 17.00 Motor Start. Study & Load Shedding Study
DAY 2    DAY 4  
08.00 – 08.30 Registration and Prepare  08.00 – 08.30 Registration and Prepare
08.30 – 10.00 Power Capacitor Calc., Spec. & DS  08.30 – 10.00 Protective Relay Coordination Study
10.00 – 10.15 Refreshment and Networking  10.00 – 10.15 Refreshment and Networking
10.15 – 11.30 Switchgear Specification & Data Sheet  10.15 – 11.30 Voltage Drop and Load Flow Study
11.30 – 12.30 Lunch and Pray  11.30 – 12.30 Lunch and Pray
12.30 – 14.00 Motor Control Center Spec. & Data S.  12.30 – 14.00 Announciator Panel
14.00 – 15.30 Distribution Board Spec. & Data Sheet  14.00 – 15.30 Bus Duct Calculation and Specification
15.30 – 15.45 Refreshment and Networking  15.30 – 15.45 Refreshment and Networking
15.45 – 17.00 UPS Capacity and Specification  15.45 – 17.00 Electrical Interface to DCS

Reviews

There are no reviews yet.

Be the first to review “POWER GENERATION & SUBSTATION DESIGN”

Your email address will not be published. Required fields are marked *