Description
Piping Design is a critical component of engineering projects and process plants. The science of piping engineering involves developing efficient piping processes that safely transport fluids and gases across industrial plants. Industrial process piping can be manufactured from wood, fiberglass, glass, steel, aluminum, plastic, copper, and concrete. The in-line components, known as fittings, valves, and other devices.
DAY 1 | DAY 3 | ||
08.00 – 08.30 | Registration and Prepare | 08.00 – 08.30 | Registration and Prepare |
08.30 – 10.00 | General Piping | 08.30 – 10.00 | Piping Support |
10.00 – 10.15 | Refreshment and Networking | 10.00 – 10.15 | Refreshment and Networking |
10.15 – 11.30 | Piping Design | 10.15 – 11.30 | Piping Support |
11.30 – 12.30 | Lunch and Pray | 11.30 – 12.30 | Lunch and Pray |
12.30 – 14.00 | Piping Procedure | 12.30 – 14.00 | Piping Layout |
14.00 – 15.30 | Piping Calculation | 14.00 – 15.30 | Piping Layout |
15.30 – 15.45 | Refreshment and Networking | 15.30 – 15.45 | Refreshment and Networking |
15.45 – 17.00 | Piping Calculation | 15.45 – 17.00 | Piping Layout |
DAY 2 | DAY 4 | ||
08.00 – 08.30 | Registration and Prepare | 08.00 – 08.30 | Registration and Prepare |
08.30 – 10.00 | Piping Analysis | 08.30 – 10.00 | Piping Material Specification |
10.00 – 10.15 | Refreshment and Networking | 10.00 – 10.15 | Refreshment and Networking |
10.15 – 11.30 | Piping Standard Drawing | 10.15 – 11.30 | Piping Material Specification |
11.30 – 12.30 | Lunch and Pray | 11.30 – 12.30 | Lunch and Pray |
12.30 – 14.00 | Piping Support | 12.30 – 14.00 | Piping Material Specification |
14.00 – 15.30 | Piping Standard Drawing | 14.00 – 15.30 | Piping Material Take Off |
15.30 – 15.45 | Refreshment and Networking | 15.30 – 15.45 | Refreshment and Networking |
15.45 – 17.00 | Piping Standard Drawing | 15.45 – 17.00 | Piping Material Take Off |
Reviews
There are no reviews yet.